This update brings changes to the shared parameter file and fixes an issue related to phasing.
Shared Parameters
We've renamed and added some shared parameters in order to unify with our other families.
Renamed parameters:
| Previous | New | Type |
|---|---|---|
| Glass Area With Glazing Bar | .Glass Area With Glazing Bar | Area |
| Glass Area Without Glazing Bar | .Glass Area Without Glazing Bar | Area |
| Opening Area | .Opening Area | Area |
| Panel Double Glazing | .Panel Double Glazing | Yes/No |
Added parameters:
| New | Type |
|---|---|
| Bay Frame | Yes/No |
| .Door Panel Thickness | Length |
| .Frame Depth | Length |
| .Rough Height | Length |
| .Rough Width | Length |
Phasing
We've fixed an issue where lines for frame and panels were hidden when host wall has "Phase Created: Existing".
Instead of the simple opening tool, this family uses various voids for the wall opening, to provide features like rough distance, render offsets, and taper reveals. This causes issues in the following scenarios:
- When placing the same window (copied instance or newly loaded) in the exact same place with different creation and demolition phases.
- When wall opening lines are hidden and host wall has "Phase Created: Existing", and window has "Phase Created: New Construction" (usually used in renovation).
Solutions for these scenarios are now described in the updated manual.

Revit version
Version 3.3 supports now all Revit & Revit LT versions from 2020.